Skip to content

Deep Ripper Machine Setup

These instructions are for dealers handing over or customers taking delivery of a new Agrowplow deep ripper machine.

AP82 Hydraulic Deep Ripper Plough

Tools/Equipment Required:

  • Basic hand tools
  • 30mm (¾ inch) delve socket
  • 30mm (¾ inch) drive rattle gun
  • Torque wrench capable of 370nm
  • 20L hydraulic oil and drum pump

Dealer Setup Tips (at workshop):

Note: The below has been written for an AP91 deep ripper with hydraulic folding wings but most steps are still relevant for other hydraulic ripper machines.

  1. Install A-frame and secure hydraulics.
  2. Connect to tractor or install jack.
  3. Unpack 3rd row of shanks and fit to machine.
  4. Tighten bolts in an opposite pattern and ensure they are tightened evenly.
  5. Fold down 4th row outriggers and tighten.
  6. Check all cylinders are full of oil, top up as required (1.5L per cylinder).
  7. Connect to tractor if not already.
  8. Lift up frame and remove/ slide up transport stands.
  9. Remove wing fold transport braces.
  10. Take out to the paddock and bleed shanks six times.
  11. Check wing fold action and inspect machines for oil leaks.
  12. Inspect all bolts and tighten as required.
  13. Fit wing fold pin prior to transport.
  14. Lift up wheel lift rams and install transport ram stops. 
  15. Drive the Agrowplow out to farm at 30kmp/h.

Farm Set Up and PDI/ SUI:

  1. Advise of safety concerns, unsupported hydraulics, contamination and oil injection etc as per pre-delivery and safe use instructions.
  2. Connect the tractor that is operating the machine.
  3. Remove wing fold pins and wheel lift rams stops.
  4. Install all ISO fittings and check all hydraulics for correct operation
  5. Check all hydraulics work correctly.
  6. Inspect wheel lift flow and adjust as required to desired rate. Approx 20-30L/min.
  7. Advise the customer of operating limits, ripping speeds, preventative maintenance, and that bolts should be retorqued after 50 hours of use. Refer to bolt torque chart in the operators manual.
  8. Show the customer how to change out common wear parts, including blades, dog bones, and shinguards.
  9. Demonstrate how to bleed the hydraulic system.
  10. Fill in the PDI/SUI paperwork.
  11. Carry out infield tests .

Infield Testing

  1. Check that the Agrowplow is set up level, and advise when is ok for it not to be level .
  2. Advise of maximum ripping speeds on any Agrowplow hydraulic breakout ripper (6km/hr).
  3. Carry out ripping and ensure the machine is level once again, place 2-inch donuts in hydraulic level adjust ram.
  4. Show the customer how to access spare parts manuals. 
  5. Advise of pack up procedure when finished ripping:  remove hydraulic pressure, place of blades to remove excessive pressure on hydraulics over time.
  6. Spray with oil and diesel or lanolin mix to prevent unwanted rust.
Previous article How to upgrade the #8-9 Hybrid Shank

Can't find the info you need?

Call us on 1300 722 491 to speak to one of our friendly team who will be happy to assist you.
Contact Us Find a Dealer